|
|
|
|
MEDICAL CONSULT
|
|
Selection of references
|
|
|
|
| |
|
Clinic Polymedical / El Menzeh 9b - Tunis / Tunisia (2007/ 2008) |
Project of a surgical and health care center with a day hospital (project in progress)
Missions :
Architectural and technical programs study, definition of the reference terms, feasibility study and business plan; assistance in the search for financing, medical conception and guiding plans of care's spaces and special batches; definition of the medical equipment requirements ; coordination of the studies and management and control of works
Surface built: 5 500 m² / Capacity: 80 beds / Cost: 11 MILLIONS Dinars |
| |
| |
|
" SAADI & RESORTS " / Jerba Aghir / Tunisia (2007) |
Integrated project of a tourism health care and residence for senior composed of a surgical and health care center, a Hotel 5 *, a center of Thalassotherapy and a Residences
Missions :
Council and medical and hotel engineering; Architectural and technical programs study, definition of the reference terms, feasibility study ; assistance in the search for financing
Surface built: 82 000 m² / Cost: 109 MILLIONS Dinars |
| |
|
|
|
Clinique les Jasmins / Centre urbain nord Tunis / Tunisia (2007) |
Project of a day hospital of in vitro procreation and of an obstetric gynecology and pediatric intensive care (project in study)
Missions :
Council and medical engineering; Study of the investment plan and the various alternatives of use of the land site; definition of the architectural program and summary estimate of Surfaces to be built and the investment cost
Surface built: 6 700 m² / Capacity: 40 beds / Cost: 10 MILLIONS Dinars |
| |
| |
|
Polyclinique Hamda Laouani / Kairouan / Tunisia (2007) |
Project of levelling and extension of à surgical and health care center by the creation of a new cardiovascular service (project being studied)
Missions :
Council and medical engineering; Architectural and technical programs study, definition of the reference terms, feasibility study and business plan , medical conception and guiding plans of care's spaces and special batches
Estimated cost: 3 MILLIONS Dinars |
| |
| |
|
Clinic of plant teeth surgery of Tunis / Soukra / Tunisia (2007) |
Project of an offshore center of plant teeth and dental surgery (project on standby)
Missions :
Architectural and technical programs Study, Medical conception and definition of the reference terms; estimate of the investment cost search for financing
Surface built: 2 400 m² / Capacity: 10 beds / Cost: 5.5 MILLIONS Dinars |
| |
| |
|
Clinic of Hannibal / Berges du Lac II / Tunisia (2006) |
Project of a health care center specialized in oncology; radiotherapy and radiology diagnosis with day hospital (project in construction )
Missions :
Study of the architectural and medical program; definition of the reference terms ; feasibility study ; medical conception and guiding plans of specific spaces of care and special batches, definition of the requirements out of medical equipment
Surface built: 11 850 m² / Capacity: 100 beds / Cost: 22 MILLIONS Dinars |
| |
|
|
|
Clinic Okba / Kairouan / Tunisia (2006) |
Project of a surgical and diagnosis center (project on standby)
Missions :
medical conception and guiding plans of care's spaces; feasibility study
Surface built: 3 900 m² / Capacity: 29 beds / Cost: 4 MILLIONS Dinars |
| |
| |
|
La grande Clinique du centre / ksar Héllal / Tunisia (2005) |
Project of a surgical and health care center
Missions :
Architectural and technical programs study, definition of the reference terms, feasibility study and business plan; medical conception ; definition of the medical equipment requirements ; assistance in the search for financing, coordination of the studies and management and control of works
Surface built: 5 400 m² / Capacity: 58 beds / Cost: 6.8 MILLIONS Dinars |
| |
| |
|
Clinic of Jerba / Jerba / Tunisia (2004) |
Project of an offshore surgical and health care center with a convalescence and a lodging house for senior (project non carried out)
Missions :
Architectural and technical programs study, definition of the reference terms, feasibility study and business plan; medical conception and guiding plans of care's spaces and special batches; definition of the medical equipment requirements
Surface built: 19 600 m² / Capacity: 235 beds / Cost: 25 MILLIONS Dinars |
| |
| |
|
Polyclinique Hammamet / Hammamet / Tunisia (2003) |
Project of a surgical and health care center
Missions :
Architectural and technical programs study, definition of the reference terms, medical conception, feasibility study and business plan; coordination of the studies and assistance in the search for financing
Surface built: 5 500 m² / Capacity: 64 beds / Cost: 7.3 MILLIONS Dinars |
| |
|
|
Clinique de la Soukra / la Soukra / Tunisia (2003) |
Project of a health care center specialized in neurology, surgery and rehabilitation.
Missions :
Architectural and technical programs study, definition of the reference terms, feasibility study and business plan; assistance in the search for financing, medical conception and guiding plans of care's spaces and special batches; definition of the medical equipment requirements ; coordination of the studies and management and control of works
Surface built: 17 200 m² / Capacity: 86 beds / Cost: 21.1 MD |
| |
|
|
Polyclinique ALYSSA / Berges du Lac – Tunis / Tunisia (2002) |
Project of a surgery and health care center specialized in obstetric gynecology, in vitro procreation, pediatric intensive care and plastic surgery
Missions :
Architectural and technical programs study, definition of the reference terms, feasibility study and business plan; medical conception ; definition of the medical equipment requirements ; assistance in the search for financing, coordination of the studies and management and control of works
Surface built: 4 500 m² / Capacity: 42 beds / Cost: 5 MILLIONS Dinars |
| |
| |
|
Polyclinique Hamda Laouani / Kairouan / Tunisia (1999) |
Project of restoration and extension of a private clinic and construction of a hemodialysis center
Missions :
medical conception and guiding plans of care's spaces; feasibility study; coordination of the studies and control of works
Surface built: 2 800 m² / Capacity: 48 beds / Cost: 2.25 MILLIONS Dinars |
| |
|
|
Polyclinique de la Marsa / La Marsa / TUNISIA (1997) |
Turn-key Project of a surgical and health care center
Missions :
Architectural and technical programs study, definition of the reference terms, feasibility study and business plan; assistance in the search for financing, medical conception and guiding plans of care's spaces and special batches; definition of the medical equipment requirements ; coordination of the studies and management and control of works
Surface built: 4 200 m² / Capacity: 40 beds / Cost: 4.5 MILLIONS Dinars |
| |